Lift installation Charges

N/A
Install Auto Procurable

No reviews have been submitted for this product



Please Click Here for the most up to date list!! Install 2-post Rotary Lift in clean bay with minimum 14' overhead clearance. Does not included 220vac@25amp electrical connection(must be provided by licensed electrician). Does not include 4.5 gallons of Mercon/Dexron III transmission fluid(must be onsite at start of installation). Concrete must meet or exceed specifications set by lift manufacturer, in this case, 4.5" of concrete, free of seams, cracks, cuts, or embedded materials, in an area of 4'x4' centered on the point that the columns will be placed.


There aren't any reviews for this product.


Categories

Back to top
Welcome to the newly designed website. You can still find all of our great inventory in our shop. If you have any problems, please feel free to contact us.